Skip to main content

ELMI – Small fixes, salary’s worth of savings 

Reading Time: 4 minutes

Organization: SIA ELMI (ELMI Ltd.), Riga, Latvia 

Author: Vita Merkulova, Manager, ELMI 

Title: Start with one daily problem: how waste sorting and a fixed fire alarm moved ELMI towards Industry 5.0 

Sector: Manufacturing — laboratory and medical-purpose equipment 

Organization(s): ELMI Ltd., with the PROSPECTS 5.0 consortium 

Introduction 

ELMI is a Riga manufacturer of laboratory and medical-purpose equipment — centrifuges, mixers, heating devices — with 53 employees and ISO 13485 certification. Design, manufacturing and service all happen on one site. 

When ELMI joined PROSPECTS 5.0, the question was simple and practical: how do we make daily operations more sustainable, cut costs, and keep working conditions good — all at once? The answer turned out not to be one big programme, but a series of small, targeted fixes. Each one touches at least one Industry 5.0 pillar: sustainability (waste, energy), human centricity (safety, stress, training) and resilience (fewer disruptions, alternative sourcing). 

Implementation Details 

Objective: Find practical improvements that make a measurable difference for a mid-sized manufacturer — for the environment, for costs and for employees. 

Approach: 

  1. Assess first. ELMI ran the PROSPECTS 5.0 Industry 5.0 assessment. It confirmed existing strengths — employee support, repairable product design, alternative sourcing — and exposed two gaps: employee training and measuring environmental impact. 
  1. Pick a costly everyday problem. Unsorted waste was expensive to dispose of. ELMI introduced proper waste sorting. 
  1. Fix what stresses people. The fire alarm reacted to dust with very loud false alarms but was not set up correctly for smoke. The control panel sat far from the work areas, so silencing a false alarm took time. ELMI replaced the detectors and is adding SMS alerts that tell designated staff exactly where an alarm went off. 
  1. Cut energy use and train people on it. ELMI started regular technical maintenance of its gas boiler plant and expanded training on safe gas system operation and efficient gas use for heating. 

Technologies Used: PROSPECTS 5.0 Industry 5.0 Assessment Framework; waste sorting system; new fire detectors with SMS location alerts; boiler plant maintenance programme; staff training on gas safety and efficiency. 

Challenges and Solutions 

  • Challenge: Sustainability and resilience felt abstract. Solution: The assessment showed that many everyday decisions already count. “Many everyday business decisions contribute to sustainability and resilience, even when we do not describe them in those terms,” says Vita Merkulova. 
  • Challenge: False fire alarms interrupted work and stressed employees. Solution: New detectors that respond to smoke, not dust, plus SMS alerts so the right person reacts fast. 
  • Challenge: Gaps in training and environmental measurement. Solution: Expanded training on gas systems and a clearer view of next priorities from the assessment. 

Impact and Results 

Key Outcomes: 

  • Lower waste disposal costs and less unsorted waste 
  • Fewer false alarms and work interruptions; faster, targeted response when an alarm does go off 
  • More efficient heating and better-trained staff on gas safety 
  • A structured way to evaluate existing practices and set next priorities 

Metrics: Waste sorting cut unsorted waste disposal costs by an amount equal to one employee’s annual salary every year. 

Lessons Learned 

“Start with one practical challenge in your daily operations, involve the employees who deal with it and measure the results,” Vita Merkulova advises. ELMI’s experience shows that small, targeted changes pay back on both sides — for people and for business. 

ELMI found the PROSPECTS 5.0 Community of Practice the most useful resource: talking directly with other companies and seeing concrete examples made it easier to turn Industry 5.0 principles into actions. 

References and Links